The brief

A 1985 flat on the third floor, split into small rooms, with old wiring and plumbing.

What we built

We took out two walls, replaced all the wiring and plumbing, and redid the floors, the windows, the bathroom and the kitchen.

Bill of quantities

ItemDescriptionUnitQty
1.01Taking out partition wallsm²22
2.01Wiring, completelump sum1
2.02Water and drainagelump sum1
3.01Plasterboard walls and ceilingsm²96
4.01Oak board floor, oiledm²58
4.02Tiles, bathroom and kitchenm²34
5.01Two-pane windowspcs4